Wind Resource
- Mean annual 80 meter wind speed prediction is 8.26 meter/second
- Net Capacity Factor 33.97% (P50)
- Prevailing wind direction is southwesterly
- Wind data collection since 2001
- Correlation with other nearby met towers and airports
- Bank qualified meteorologist report completed
Transmission
- Interconnection agreement executed
- Collection system 25kV
- Four miles of interconnection to a 69 kV transmission line
Site information and Control
- Land is owned by the developer, lease in place
- Phase I Environmental Site Assessment complete
- Seismic zone 3
- Cold weather package required
- Micro-siting complete
Permitting
- Environmental permitting complete with exception of pending NPDES
- FAA initial permit complete (resubmission pending due to relocated turbine—remains within height restrictions)
- Zoning approval complete
- Conditional Use Permit approved
Power Purchase Agreement / REC Contract
- Executed 20 year PPA in place with ‘A-‘ off-taker
- PPA with a levelized and non-levelized power price option
- REC term sheet from ‘AA’ rated off-taker, 20 year term
Turbines
- GE 1.5MW sle
- Initial GE Site Suitability Report complete (resubmission pending due to relocation of a turbine)
- 80 meter towers
Construction and Operational Details
- Geotechnical study in process
- EPC Contract in place with Chevron Energy Solutions
- Transformer purchased and in temporary storage near site
Desired Transaction
Developer desires a cash upfront project purchase.
|